New Architecture April 2024 Special Issue / Weaving Time: Takenaka Corporation's Legacy Design
Go to next photo Go to previous photo
shinkenchiku april
shinkenchiku april
shinkenchiku april
shinkenchiku april
shinkenchiku april
shinkenchiku april
shinkenchiku april

New Architecture April 2024 Special Issue / Weaving Time: Takenaka Corporation's Legacy Design

16.50 $
Description
Shinkenchiku April 2024 Special Issue
Weaving Through Time
Takenaka Corporation's Legacy Design
¥3850

Read only a few times, with no noticeable scratches or dirt.
As this is a used item, please refrain from purchasing if you are sensitive. Anonymous shipping will be provided.

Weaving Through Time: Takenaka Corporation's Legacy Design Content
Opening Interview
Takenaka Corporation's Legacy Design
Terunobu Fujimori

Opening Essay
The Transition and Future of Historic Building Preservation and Utilization
Osamu Goto

CHAPTER 1
Designing the System of Inheritance
Former Yamaguchiman-kichi Residence Kudan House
Hori Building Preservation and Utilization Project
Narai-juku Old House Group Utilization Project
Kyoto Higashiyama Project (Sanso Kyōto Yamato / Park Hyatt Kyoto)
Chōchiku-kyo by Kōji Fujii, Fifth Self-Residence

CHAPTER 2
Leveraging Modern Style Architecture
Meiji Seimei Kan Renovation
Nishi Honganji Denendo-in Preservation and Repair
Seisen University Main Building (Former Shimazu Duke Residence) Preservation and Repair
Column Construction Technology | Seismic Reinforcement Technology for Brick Buildings
National Treasure Former Tomioka Silk Mill West Cocoon Storehouse Preservation and Maintenance Work
Former James Residence Renovation
Rissei Garden HULIC Kyoto
Daimaru Shinsaibashi Store Main Building Renovation
Takashimaya East Building Renovation
| Nihonbashi Takashimaya Renovation |
Former National Station Building Reconstruction
Former Sakuramiya Public Hall Renovation
Nihonbashi Daiya Building
Column Construction Technology | Preservation and Regeneration Work Overseas
National Gallery Singapore
Column Construction Technology | Preservation and Renovation of Modernist Architecture
Kamakura Bunkakan Tsurugaoka Museum (Former Kanagawa Prefectural Museum of Modern Art)
Nagoya University Toyoda Auditorium Renovation
Column Preservation and Renovation | Preservation and Renovation of Modernist Architecture
Mido Building
Column Seismic Isolation Technology | Preservation and Utilization of Structures
Tsutenkaku Tower
Chubu Electric Power MIRAI TOWER (Former Nagoya TV Tower)

CHAPTER 3
Connecting Japanese Tradition to the Future
Tōshōdai-ji Temple Golden Hall Preservation and Repair
Nariai-ji Temple Five-Storied Pagoda
Sabadaishi Honbo Tahōtō Pagoda
Yakushi-ji Temple Dining Hall Reconstruction
Tsurugaoka Hachimangu Shrine Dance Stage Renovation
Horinouchi Myōhō-ji Temple Main Hall Renovation
Takebe Taisha Shrine Main Shrine and Gon-den Renovation
| Yūten-ji Temple Main Hall and Shoin Renovation |
Koshioi Shrine Haiden
Mishima Taisha Shrine Dance Stage Renovation
Suitengu Shrine Reconstruction
Column Construction Technology | Manufacturing that Integrates Tradition and Digital Technology
Heijo Palace Site Historical Park First Daigokuden-in East Tower Restoration

Roundtable Discussion
Connecting History to the Future
- Initiatives by Takenaka Corporation Experts
Details
Category
Specialty
Condition
No noticeable scratches or marks
Shipping
Included in price (by seller)
From
Nara
video
Delivery in 24/48 h

SHIPPINGS

Free shipping in Spanish mainland, Balearic Islands and Portugal.

For other countries the shipping cost will be paid by the client.

DELIVERY TIME (as of delivery)

Spanish mainland, Balearic Islands and Portugal: 1-2 working days.

Other countries, we attach a table with those that are open in the online store, indicating transporter and transit days.

Free returns

The return period is 14 calendar days from the receipt of the order.

Carriers for change of size in Spanish mainland, Balearic Islands and Portugal, are in charge of 24HRS.